The Public Infrastructure Engineering Vulnerability Committee identified buildings as one of four priority classes of infrastructure for consideration using the First National Engineering Vulnerability Assessment to gauge vulnerability and adaptability of infrastructure to climate change.
Three buildings – one low-rise and two high-rise – at Tunney’s Pasture Campus in Ottawa were assessed in this case study. The Sustainable Development Group of HOK Architects of Ottawa conducted the case study.
Consultant:
MPHM Project Managers Inc.