Ontario

arrow graphic

The Metrolinx Five Year Strategy

The Metrolinx Five Year Strategy (2015-2020) included the provision for a Corporate Climate Adaptation Plan to be established by 2018. In view of this goal, Metrolinx created a Senior Advisor position in resiliency and adaptation, and engaged a project team, consisting of specialists from AECOM, Risk Sciences International and Toronto Region Conservation Authority, to conduct a pilot study on climate change vulnerabilities.

French

The Metrolinx Five Year Strategy

The Metrolinx Five Year Strategy (2015-2020) included the provision for a Corporate Climate Adaptation Plan to be established by 2018. In view of this goal, Metrolinx created a Senior Advisor position in resiliency and adaptation, and engaged a project team, consisting of specialists from AECOM, Risk Sciences International and Toronto Region Conservation Authority, to conduct a pilot study on climate change vulnerabilities.

English

Ontario's Electrical Transmission Sector - Climate Change Vulnerability Assessment

Conducted over the 2013-2015 time period, the study was overseen by the Power System Planning staff of the Ontario Power Authority, since amalgamated with Ontario’s Independent Electricity System Operator (IESO), and made use of the PIEVC Protocol, an Engineers Canada-developed engineering vulnerability assessment tool.

French

Ontario's Electrical Transmission Sector - Climate Change Vulnerability Assessment

Conducted over the 2013-2015 time period, the study was overseen by the Power System Planning staff of the Ontario Power Authority, since amalgamated with Ontario’s Independent Electricity System Operator (IESO), and made use of the PIEVC Protocol, an Engineers Canada-developed engineering vulnerability assessment tool.

English

Union Water Supply System (UWSS)

The Union Water Supply System (UWSS) is a municipal water supply system that is jointly owned by the Ontario municipalities of Leamington, Kingsville, Essex and Lakeshore.

French

Toronto Hydro-Electric System Limited Climate Change Vulnerability Assessment – Distribution Sector

The current study aims to evaluate the vulnerability of Toronto Hydro’s electrical distribution system within the City of Toronto to a changing climate by employing Engineers Canada’s Public Infrastructure Engineering Vulnerability Assessment Protocol (PIEVC Protocol). This study is a high level screening analysis designed to determine where infrastructure vulnerabilities to climate change may be present, to suggest avenues for adapting infrastructure to climate change, and to identify areas of further study.

French

Assessment of the Union Water Supply System

The Union Water Supply System (UWSS) is a municipal water supply system that is jointly owned by the Ontario municipalities of Leamington, Kingsville, Essex and Lakeshore. The UWSS is governed by a joint board of management that consists of board members from each of the four owner municipalities. Day to day administration of the system is led by the UWSS General Manager. The system is operated under contract by the Ontario Clean Water Agency (OCWA). Treated water from UWSS is supplied to the four owner municipalities for local distribution to residents and businesses.

French

Assessment of Toronto Pearson Airport Infrastructure

The GTAA decided to undertake an engineering vulnerability assessment of infrastructure in the context of both the existing climate and future climate change using the PIEVC Protocol. The Protocol is a step-by-step process to conduct an engineering vulnerability asessment on infrastructure due to climate change.

Potential issues and concerns arising from changing climate:

French

Assessment of Toronto Hydro Electrical Supply and Delivery Infrastructure

Key stakeholders in the City of Toronto such as the WeatherWise Partnership have recognized the importance of the electrical sector and its vulnerability to a changing climate, and targeted it in 2011 as a priority area for further investigation. As part of this endeavour, Engineers Canada engaged the Clean Air Partnership to work with Toronto Hydro-Electrical System Limited (THESL) in order to demonstrate the applicability of the Protocol on Toronto Hydro owned electrical distribution infrastructure in the City of Toronto.

French

Assessment of 285 Shuter Street Apartment Tower

This report is a Case Study of the climate change vulnerability of a residential high-rise apartment tower at 285 Shuter Street owned by Toronto Community Housing Corporation (TCHC) and occupied by residential tenants. The building is a 16-storey apartment building constructed in 1964 and part of the TCHC portfolio of social housing, which includes more than 2215 buildings including high, mid and low-rise apartments, townhouses and houses. It is part of a three-tower complex currently within the Toronto Tower renewal program.

French