A changing climate has resulted in increases in temperature and extreme weather events in southern Ontario. Physical impacts from heat waves, strong winds, and flooding have been experienced in the Town of Aurora and are projected to occur more frequently and with greater intensity. As climate change continues to shift weather patterns and norms, it is important to understand how these changes may manifest in the Town of Aurora, and what the impact to the community may be. Attachments Town … Read more “Town of Aurora Climate Change Adaptation Plan”
Category Bridges
Category Bridges
Étude des risques aux changements climatiques des installations de l’Aéroport des Îles-de-la-Madeleine Rapport d’évaluation des risques et mesures d’atténuation
Posted onÉtude des risques aux changements climatiques des installations de l’Aéroport des Îles-de-la-Madeleine Rapport d’évaluation des risques et mesures d’atténuation Attachments Stantec – SPACSTC – May 2020 – FR (6 MB)
Category Bridges
PortsToronto Climate Change and Extreme Weather Vulnerability Assessment of PortsToronto Assets FINAL REPORT
Posted onAttachments AECOM – Ports Toronto – May 2019 (12 MB)
Category Bridges
THREE NEWFOUNDLAND AND LABRADOR INFRASTRUCTURE CASE STUDIES
Posted onRisk assessment of three Newfoundland and Labrador infrastructure case studes: A bridge in Corner Brook, Stormwater infrastructure in Goulds, and a high school in Placentia. Attachments Three Newfoundland and Labrador Infrastructure Case Studies – Presentation (3 MB)
Category Bridges
CITY OF EDMONTON ASSESSMENT FOR THE QUESNELL BRIDGE
Posted onThis Quesnell Bridge case study was undertaken following the steps outlined in the PIEVC Engineering Protocol for Climate Change Infrastructure Vulnerability Assessment (October 2007) (the Protocol) which was developed by PIEVC for the purpose of providing a uniform platform in assessing infrastructure vulnerability to climate change. The five major steps in the protocol guide the practitioner in defining the project parameters and gathering relevant information, then, subsequently, in performing qualitative and indicator analyses to identify whether vulnerability exists in certain … Read more “CITY OF EDMONTON ASSESSMENT FOR THE QUESNELL BRIDGE”
