EN Calgary Transit (CT)’s Climate Risk and Resilience Assessment (CRRA) delivers a detailed and forward-looking evaluation of how climate change is impacting Calgary’s transit infrastructure, operations, and service delivery. As climate-related hazards intensify, the CRRA was initiated as a key action identified in the City’s RouteAhead Strategy to assess vulnerabilities across the transit system and support long-term planning. The CRRA is aligned with the City of Calgary’s Climate Risk Assessment Framework and applies a structured, portfolio-wide methodology grounded in international … Read more “Calgary Transit Climate Risk & Resilience Assessment (CRRA)”
Category Electrical Transmission
Category Electrical Transmission
Climate Risk and Vulnerability Assessment (CRiVA) – Eureka HAWS
Posted onThe Government of Canada has initiated efforts to prepare communities for climate change impacts, prompting Public Services and Procurement Canada (PSPC) to focus on federal assets. As part of this, PSPC enlisted AECOM to conduct a Climate Risk and Vulnerability Assessment (CRiVA) for the Eureka High Arctic Weather Station (HAWS) in Nunavut, managed by Environment and Climate Change Canada (ECCC). Using the PIEVC Protocol to assess the station against current and future climate conditions, the assessment covered the timeframes of … Read more “Climate Risk and Vulnerability Assessment (CRiVA) – Eureka HAWS”
Category Electrical Transmission
Summerside Solar and Storage Integration Project – Summerside, Prince Edward Island, Canada
Posted onThe City of Summerside is working with Samsung Renewable Energy to develop a community microgrid connected to the City’s distribution system. The microgrid combines 21 MWac/26 MWdc of solar photovoltaic (PV) generation with a 10 MW/20MWh battery system. The project is expected to generate 33,000 MWh per year in solar PV energy and reduce the City’s reliance on New Brunswick’s power grid from 58.2% to 37.4%, allowing Summerside to achieve a level of 62% of green energy for all its … Read more “Summerside Solar and Storage Integration Project – Summerside, Prince Edward Island, Canada”
Category Electrical Transmission
Distribution System Climate Risk and Vulnerability Assessment – Hydro Ottawa
Posted onOver 330,000 residences and businesses in the City of Ottawa and the Village of Casselman depend on Hydro Ottawa Limited (Hydro Ottawa) to supply continuous and reliable electrical service. In recent years, notably in 2018, Hydro Ottawa distribution infrastructure has been subjected to particularly extreme weather events that caused severe damages to their system. These events resulted in widespread outages and costly recoveries. In an effort to maintain reliable service in the coming years, Hydro Ottawa has retained Stantec Consulting … Read more “Distribution System Climate Risk and Vulnerability Assessment – Hydro Ottawa”
Category Electrical Transmission
ONTARIO’S ELECTRICAL TRANSMISSION SECTOR – CLIMATE CHANGE VULNERABILITY ASSESSMENT
Posted onConducted over the 2013-2015 time period, the study was overseen by the Power System Planning staff of the Ontario Power Authority, since amalgamated with Ontario’s Independent Electricity System Operator (IESO), and made use of the PIEVC Protocol, an Engineers Canada-developed engineering vulnerability assessment tool. Attachments electricity_transmission_vulnerability_-_ap240_-_sept172015_presentation (763 KB)electrical-tranmission_pievc_final-report_public (1 MB)
Category Electrical Transmission
Toronto Hydro-Electric System Limited Climate Change Vulnerability Assessment
Posted onAttachments AECOM – RSI – Toronto Hydro – June 2015 (3 MB)
Category Electrical Transmission
Toronto Hydro-Electric System Public Infrastructure Engineering Vulnerability Assessment Pilot Case Study
Posted onThus, the objective of this pilot case study is to evaluate the vulnerability of selected THESL distribution infrastructure to current climate, using the Protocol, Steps 1 to 3, to structure the evaluation. The infrastructure components selected by THESL for this project are seven feeder systems from three sub-stations: Area A Station: Three 27.6 kV feeders: A-1, A-2 and A-3; Area B Station: Two 13.8 kV feeders: B-1; B-2; Area C Station: Two 13.8 kV feeders: C-1; C-2. … Read more “Toronto Hydro-Electric System Public Infrastructure Engineering Vulnerability Assessment Pilot Case Study”
