Toronto Hydro-Electric System Limited Climate Change Vulnerability Assessment – Distribution Sector

June 2015
The current study aims to evaluate the vulnerability of Toronto Hydro’s electrical distribution system within the City of Toronto to a changing climate by employing Engineers Canada’s Public Infrastructure Engineering Vulnerability Assessment Protocol (PIEVC Protocol). This study is a high level screening analysis designed to determine where infrastructure vulnerabilities to climate change may be present, to suggest avenues for adapting infrastructure to climate change, and to identify areas of further study.
Ontario
Consultant:
AECOM and Risk Sciences International