Thus, the objective of this pilot case study is to evaluate the vulnerability of selected THESL distribution
infrastructure to current climate, using the Protocol, Steps 1 to 3, to structure the evaluation. The infrastructure
components selected by THESL for this project are seven feeder systems from three sub-stations:
Area A Station: Three 27.6 kV feeders: A-1, A-2 and A-3;
Area B Station: Two 13.8 kV feeders: B-1; B-2;
Area C Station: Two 13.8 kV feeders: C-1; C-2.
Toronto Hydro-Electric System Public Infrastructure Engineering Vulnerability Assessment Pilot Case Study
Toronto Hydro-Electric System Public Infrastructure Engineering Vulnerability Assessment Pilot Case Study