Province/ Territory Yukon

CLIMATE RESILIENCE ASSESSMENT: TOWN OF FARO WATER, SEWER AND ROAD UPGRADES – PHASES 2 & 3

Posted on

The Town of Faro, located about 360 km North of Whitehorse is undergoing upgrades to its water, sewer, storm water and road infrastructure under the management of the Yukon Government – Community Services (YG-CS). The project is split into multi phases following the length of the construction season. Phase 1 is being built this summer (2019), while Phases 2 and 3 are not designed yet. Construction of Phases 2 and 3 will start next summer (2020) and will continue until … Read more

Province/ Territory Yukon

MINE ACCESS ROADS IN NORTHERN CANADA – ECONOMIC IMPLICATIONS OF CLIMATE CHANGE

Posted on

Note: This project used the PIEVC Protocol for various parts of the work, as well as additional surrounding work. An example of how the PIEVC Protocol can be integrated into large projects of wider scope. This study evaluates the climate-related vulnerabilities and related costs and benefits of the Tibbitt to Contwoyto Winter Road (TCWR), a mine access road built mainly over frozen lakes in the northeastern region of the Northwest Territories (NWT). The TCWR is the main access road for … Read more

Province/ Territory Yukon

MINE ACCESS ROADS IN NORTHERN CANADA – ECONOMIC IMPLICATIONS OF CLIMATE CHANGE

Posted on

Note: This project used the PIEVC Protocol for various parts of the work, as well as additional surrounding work. An example of how the PIEVC Protocol can be integrated into large projects of wider scope. This study evaluates the climate-related vulnerabilities and related costs and benefits of the Tibbitt to Contwoyto Winter Road (TCWR), a mine access road built mainly over frozen lakes in the northeastern region of the Northwest Territories (NWT). The TCWR is the main access road for … Read more