Attachments AECOM – Ports Toronto – May 2019 (13 MB)
PortsToronto Climate Change and Extreme Weather Vulnerability Assessment of PortsToronto Assets FINAL REPORT
Posted onTHREE NEWFOUNDLAND AND LABRADOR INFRASTRUCTURE CASE STUDIES
Posted onRisk assessment of three Newfoundland and Labrador infrastructure case studes: A bridge in Corner Brook, Stormwater infrastructure in Goulds, and a high school in Placentia. Attachments Three Newfoundland and Labrador Infrastructure Case Studies – Presentation (3 MB)
CITY OF EDMONTON ASSESSMENT FOR THE QUESNELL BRIDGE
Posted onThis Quesnell Bridge case study was undertaken following the steps outlined in the PIEVC Engineering Protocol for Climate Change Infrastructure Vulnerability Assessment (October 2007) (the Protocol) which was developed by PIEVC for the purpose of providing a uniform platform in assessing infrastructure vulnerability to climate change. The five major steps in the protocol guide the practitioner in defining the project parameters and gathering relevant information, then, subsequently, in performing qualitative and indicator analyses to identify whether vulnerability exists in certain … Read more